Skip to Main Content
IEDR Ideas Portal

Please use this portal to submit ideas for our development team to consider in its roadmap. For support or data issues, please send an email to: iedr-support@esource.com to receive more immediate assistance.

ADD A NEW IDEA

All ideas

Showing 33 of 33

In the queued DERs data table, it is unclear how “Planned Install Date” is calculated/obtained

In the queued DERs data table, it is unclear how “Planned Install Date” is calculated/obtained. No explanation of this is given in documentation and does not correspond to any dates given in PSC SIR data for DER projects
John Sasso about 1 year ago in EIAT 0

In the column header, should specify units in “DER Nameplate Rating” in table of interconnected and enqueued DER projects.

In the column header, should specify units in “DER Nameplate Rating” in table of interconnected and enqueued DER projects. If new users are supposed to understand this, don't assume they know the units of the DER projects (which appears to be kW)
John Sasso about 1 year ago in EIAT 0 Prioritized

List transformers configured in N-1 scenario

Substation HC calculated might not always consider transformers that are configured in N-1 scenario (emergency/backup). HC calculated in interconnection studies are can be drastically different. Easy fix to this would be, addiing a note that lists...
Dhruv Patel about 1 year ago in EIAT 1

Refer date or last update date

Information on when the data was last refreshed will inform customers to better judge the data and cross reference with other resources as needed. Can be challenging to show different refresh dates for DER conencted & queued & feeder HC &a...
Dhruv Patel about 1 year ago in EIAT 1 Future consideration

Search bar criteria/filter to allow search of specific feeder#, DER #, substation name etc

Increased efficiency
Dhruv Patel about 1 year ago in EIAT 0 Future consideration

Withdrawn DERs from SIR inventory

Being able to view, filter, report, and analyze the inventory of “withdrawn” DERs from the SIR inventory would be useful. DER interconnection applications are withdrawn for a multitude of reasons; the ability to view, report on, and analyze withdr...
Guest 5 months ago in EIAT 0

Dynamic monitoring and calculations of DER Hosting Capacity

The ability to quantify how much hosting capacity is available for DER installations within a specified area, at a given point in time, throughout time, and the resultant metrics may be used to support the practicalities of Climate Act goal soluti...
Guest 5 months ago in EIAT 0

Integrate the NYS DPS SIR Database

The SIR database is an authoritative source of information on distributed generation deployments across NY state. The addition and maintenance of this data set would integrate nicely with the hosting capacity maps and add a time dimension to DER c...
Guest 10 months ago in EIAT 0

Unable to search with latitude, longitude coordinates

In the location search field, I am unable to search with latitude, longitude coordinates. This feature is available in all other maps out there
John Sasso about 1 year ago in EIAT 0 Prioritized

List of projects enqueued appear not be in their actual order in the queue

Enqueued DER should be listed in their order in the queue
John Sasso about 1 year ago in EIAT 0 Prioritized