List transformers configured in N-1 scenario
Merged
Substation HC calculated might not always consider transformers that are configured in N-1 scenario (emergency/backup). HC calculated in interconnection studies are can be drastically different.
Easy fix to this would be, addiing a note that lists names of transformers that are configured in N-1 scenario. Developers can then individually refer the name to verify HC on each of the connected transformers.
Drury MacKenzie
Mar 30, 2023
We are not planning to show substation HC in IPV; this information is in discussions for possible future release.